How Long Does It Take to Build a Home or Addition?
- Yelinko Builders
- May 29
- 2 min read

If you're planning to build a new home—or add a major expansion to your existing one—you've likely asked the most common question we hear at Yelinko Builders:
“How long is this going to take?”
While the timeline for any construction project depends on several factors, understanding the general phases and what influences them can help you set clear expectations—and avoid surprises.
Let’s break down the average construction timeline for a custom home build or major home addition, and what you can expect at each step.
Pre-Construction: Planning, Permits & Prep (1–3 Months)
Before we ever pick up a hammer, there’s essential groundwork that needs to happen:
Site evaluation & surveys
Architectural drawings and design approvals
Permit applications and reviews
Budget finalization and contracts
Working with an experienced builder like Yelinko means we handle permits and paperwork, so you don’t have to chase city departments or figure out zoning rules yourself.
Foundation to Framing (1–2 Months)
Once permits are approved and materials are ordered, we begin with site work:
Land clearing and grading
Foundation pouring (slab, crawlspace, or basement)
Framing the structure (walls, floors, roof)
This phase starts to bring your project to life and goes relatively quickly if weather and materials cooperate.
Systems Installation: Plumbing, Electrical, HVAC (1–1.5 Months)
After the shell is built, we install what we call the “rough-ins”:
Electrical wiring and breaker panels
Plumbing lines and venting
HVAC ductwork and furnace or AC unit installs
These critical systems are inspected before moving forward.
Interior Finishes & Details (1.5–3 Months)
This is the longest and most detailed phase of your build. It includes:
Insulation and drywall
Flooring and cabinetry
Painting, tiling, and trim
Fixture installation (lights, sinks, hardware)
Because this is where your personal design preferences come to life, it often requires more collaboration and on-the-fly adjustments.
Final Touches, Inspections & Walkthrough (1–3 Weeks)
We wrap up the project with:
Final building inspections
Punch list repairs or touch-ups
Deep cleaning
Final walkthrough and handoff
🕒 So, How Long Does It Take Overall?
Project Type | Average Timeline |
Custom Home Build | 6 to 12 months (from permit approval) |
Major Home Addition | 4 to 6 months (from permit approval) |
Delays can happen due to:
Weather (especially in exterior or foundation stages)
Permit holdups or inspection scheduling
Material or product backorders
Scope changes during the project
At Yelinko Builders, we create realistic timelines from the start and keep you updated throughout the process. No surprises—just steady, honest progress.